Procyon PTS 2100 power supply test system
A turnkey system for testing power supplies and converters at production cadence.

What it is for here
Production test is a throughput problem before it is a measurement problem. The constraint nobody writes into the standard is that the test has to be repeatable at line speed, not merely correct on a bench.
Why it is on the UK site
The integration layer, not an instrument — which is the half of Intepro that British distributors do not compete with.
Specifications
A system’s figures follow from its configuration — the instruments in the rack and what the sequence asks of them. Rather than reprint a table for a configuration you may not need, send the requirement — the standard, the device under test, the power envelope and the cadence — and an engineer will come back against the current document.
Other systems
- Programmable DC with arbitrary transient sequencingThe DC side of military land-platform testing — wide input, and transients you cannot produce with a bench supply.
- CTS4000 battery test systemCycling and characterisation for cells, modules and packs.
- SemTest semiconductor reliability ATEReliability and characterisation test for power semiconductors.
- PowerStar test executiveThe software layer that sequences a test and produces the record of it.
