Sectors

Power supply and electronics manufacturing

Production test, and getting the same product lawfully onto three markets.

Who buys this: Manufacturers selling into Great Britain, Northern Ireland and the EU.

Why it matters now

Most British manufacturers in this position are working from compliance copy written before October 2024 and now wrong on its face. CE marking is accepted in Great Britain with no end date; the 2027 date most people worry about governs where the UKCA mark may be placed.

What the work actually involves

On the line, the questions are throughput and repeatability rather than compliance: how many units an hour, how much of the sequence is unattended, and whether the record produced is one an auditor will accept without argument. Auto-ranging matters here more than peak power — a line running both 115 V and 230 V product should not need two sources or a changeover.

Assessed against

Systems we build for it

Equipment it usually needs

Talk it through

Tell us the standard and the device under test. That is enough for an engineer to answer usefully instead of sending a brochure.

Send a requirement+44 1252 875600