ENA EREC G99 Issue 2
Grid-code type testing to G99 Issue 2
The British connection standard for generation above the G98 threshold, and the one that names a variable AC test supply in its own text.
Issue 2 introduced requirements for Power Generating Modules incorporating Electricity Storage that came into force on 1 March 2026. Anyone connecting storage in Britain is inside that regime now.
Why this reaches the test bench
What gets tested
- Interface Protection
- LFSM-O
- LFSM-U
- RoCoF
- Fault Ride Through
- Vector Shift
Northern Ireland
Normatively referenced
How this differs from the American regime
The American equivalent regime is IEEE 1547 with UL 1741 SA/SB — different tests, different trip settings, a different certification culture. A US page cannot serve a British connection application.
Sources
- ENA EREC G99 Issue 2 — Energy Networks Association, via the GB Distribution Code site. Retrieved 2026-09-05.Supports: Issue 2, dated 10 March 2025; the storage requirements in force 1 March 2026; Annex A.7.1.2.2 test method
Issue numbers and transition dates move, and several in this field are still quoted wrongly. The compliance calendar tracks the dates that moved, the ones that quietly passed, and thirteen this market repeats wrongly — each against the instrument it comes from.