PowerStar test executive
The software layer that sequences a test and produces the record of it.
What it is for here
A compliance programme is judged on its evidence. The executive is what turns a rack of instruments into a repeatable sequence and a report someone will sign — and hardware-independence matters when an instrument is replaced mid-programme and the report must still be comparable.
Why it is on the UK site
The part of the system that outlives the instruments in it.
Specifications
Published figures for this line are held on the manufacturer’s current datasheet, and they change. Rather than reprint a table that goes stale, send the requirement — the standard, the device under test, the power envelope and the cadence — and an engineer will come back against the current document.
Other systems
- PAS-F regenerative AC source and grid simulatorThe variable AC test supply G99 Annex A.7.1.2.2 describes, with the absorbed power returned to the grid rather than dissipated.
- AMF 400 Hz aircraft AC source400 Hz ground power for airborne equipment test.
- AFV and AFV+ programmable AC sourceGeneral-purpose programmable AC where the requirement is a clean, controllable supply rather than grid emulation.
- Programmable DC with arbitrary transient sequencingThe DC side of military land-platform testing — wide input, and transients you cannot produce with a bench supply.
