CTS4000 battery test system
Cycling and characterisation for cells, modules and packs.

Answers directly to
What it is for here
The EV Smart Charge Points Regulations 2021 require a technical file containing test reports for charge points sold in Great Britain. Battery and charging test programmes generate exactly those reports, and they have to be defensible when a purchaser asks to see the file.
Why it is on the UK site
A GB-only regulation with a documentary requirement, on a product category this system already serves.
Specifications
A system’s figures follow from its configuration — the instruments in the rack and what the sequence asks of them. Rather than reprint a table for a configuration you may not need, send the requirement — the standard, the device under test, the power envelope and the cadence — and an engineer will come back against the current document.
Other systems
- Programmable DC with arbitrary transient sequencingThe DC side of military land-platform testing — wide input, and transients you cannot produce with a bench supply.
- Procyon PTS 2100 power supply test systemA turnkey system for testing power supplies and converters at production cadence.
- SemTest semiconductor reliability ATEReliability and characterisation test for power semiconductors.
- PowerStar test executiveThe software layer that sequences a test and produces the record of it.
